Author: Rajesh Paul
Posted: Tue Jun 07, 2016 9:21 pm (GMT 5.5)
Hi Nic,
Thanks for your Input. The challenge what I am facing out here is most of the documents I have been going though describes topÃcs related to Long term plan, Current Plan, creating applications etc.. which I am not specifically looking for. These are some of the things which we do once TWS/OPC is already set up..
What I am to be specific looking for is if I am planning to create test TWS/OPC Environment then what are the prerequisites. I am Aware of what Subsystems are, then what is Workstation, PARMLIB & PROCLIB dataset, Initialization Statements, different Parameters like (BATCHOPT, AROPTS etc), TRACKER, CONTROLLER; but I am seeking for some Information like how they are interconnected.
Hope this make a sense..
Posted: Tue Jun 07, 2016 9:21 pm (GMT 5.5)
Hi Nic,
Thanks for your Input. The challenge what I am facing out here is most of the documents I have been going though describes topÃcs related to Long term plan, Current Plan, creating applications etc.. which I am not specifically looking for. These are some of the things which we do once TWS/OPC is already set up..
What I am to be specific looking for is if I am planning to create test TWS/OPC Environment then what are the prerequisites. I am Aware of what Subsystems are, then what is Workstation, PARMLIB & PROCLIB dataset, Initialization Statements, different Parameters like (BATCHOPT, AROPTS etc), TRACKER, CONTROLLER; but I am seeking for some Information like how they are interconnected.
Hope this make a sense..